Talkeetna Water & Sewer
Meters & Permits
Metering:
Metering is required for all commercial and industrial customer classes receiving water service from the Utility. One meter is to be installed for each connection.
If more than one structure, recreation vehicle (RV), or mobile home is connected to a single water service connection, the service must be metered and will be considered a commercial account and charged accordingly.
Connection Permits:
The developer, property owner, or authorized agent shall acquire a connect permit from the Utility for each water connection and water extension prior to its construction. The developer, owner, or authorized agent must complete the permit application, designate the size of connection and pay the permit fee as set forth in the schedule of fees and charges. No water connection will be made without the required permit.
|