Matanuska-Susitna Borough

20-017Q: Beaver Lake Rd Earthquake Damage Repairs

Issue Date:
June 28, 2019 09:55 am


Sealed Quote Due:
July 12, 2019 10:00 am


Quote Description: This project’s purpose is to perform temporary patches where the asphalt was damaged on two sites of Beaver Lake Road in Big Lake, Alaska that were caused by the November 30, 2018 Cook Inlet Earthquake (DR4413).
Provide all materials, labor and equipment to prepare areas with existing onsite material and pave with 2” Hot Mix Asphalt, Type II-B. Grade, compact with moisture control, and establish smooth transition to existing asphalt. Any excess grading material may be placed uniformly on shoulder and fore slope.

20-017Q Documents

20-017Q - Request for Quotes (pdf 174.56 KB)   |  116 hits

20-017Q - Bid Opening Analysis Sheet (pdf 480.37 KB)   |  93 hits